Updating construction progress of New Hope factory (08/2013)
06/11/2014(13/08/2013) Photos at the construction site: Finished product warehouse is going to be completed Steel structure erection Manufacturing tower is going to be finished erecting steel structure Break bulk warehouse is finished formwork
(13/08/2013)
Photos at the construction site:
Finished product warehouse is going to be completed Steel structure erection
Manufacturing tower is going to be finished erecting steel structure
Break bulk warehouse is finished formwork installation, conducting bolt locating and preparing for concreting work.
- Duy Hoang -
Tin công ty
-
EUROFINS GHI NHẬN NĂNG LỰC TỔNG THẦU DESIGN & BUILD CỦA CJSC
Eurofins ghi nhận năng lực tổng thầu Design & Build của...
-
CJSC ĐỘNG THỔ DỰ ÁN NHÀ MÁY GLITTER VIỆT NAM – CÔNG TRÌNH TIÊN PHONG TẠI KCN HẢI LONG, HƯNG YÊN
Ngày 06/12, Lễ động thổ Dự án Nhà máy Glitter Việt Nam đã...
-
CJSC ĐƯỢC COOLER MASTER VINH DANH NHÀ CUNG CẤP DỊCH VỤ XUẤT SẮC 2025
Ngày 24/10/2025, tại thành phố Huệ Châu (Trung Quốc), Tập...