Update schedule of Ohashi project (04/07/2013)

06/11/2014

Until the end of the 4thconstruction week of June (from 24/06 to 30/06), Ohashi Tekko Vietnam factory project has some main items being constructed including: - Workshop item: is being built wall around. - Office item: Process and install


Until the end of the 4thconstruction week of June (from 24/06 to 30/06), Ohashi Tekko Vietnam factory project has some main items being constructed including:

- Workshop item: is being built wall around.

- Office item: Process and install formwork, reinforce and cast concrete for first and second floor; process and install reinforce, formwork bracing lintel.

- Underground tank: Process and install formwork, reinforce for water tank; cast concrete for water tank.

- Safeguard house: process and install formwork, reinforce and cast concrete roof for workshop.

- Electrical system for office: Install available pipe on first floor of office.

Some pictures in the site


Install formwork, reinforce bracing floor in office


Inspect the work of reinforce installation for first floor 


The process of concrete construction for first floor


Inspect and cast concrete for underground water tank installation


Work of building workshop’s wall


Concrete maintainance


Inspect the work of installing reinforce for column on second floor


The work of checking steel structure in NCC factory

- Duy Hoang -

Liên hệ

Trụ sở chính:

Phòng 605, Toà nhà Toyota Mỹ Đình, Số 15 Phạm Hùng, Phường Cầu Giấy, Hà Nội

Tel: (+84) 243.7957.717

Fax: (+84-4).3795.7716

Chi nhánh phía Nam:

Số nhà 55, đường S, khu đô thị Lakeview City, phường Bình Trưng, TP. HCM

Tel: (+84-28).3535.1497

Email: cjsc@cjsc.vn
Hotline: (+84) 983.384.888

© CJSC. All rights reserved | Design by Vtechcom

Lên đầu trang