CJSC

Investor's Confidence

Finishing work in NPI site

16/06/2015

Perspective of NPI Vietnam Factory Some pictures of finishing work in site The front side of office Pictures of inside the office Gypsum ceiling, EPS panel, lighting system installation Cleaning workshop floor before painting Epoxy


 

anh npi

Perspective of NPI  Vietnam Factory

 

Some pictures of finishing work in site

The front side of office

Pictures of inside the office

Gypsum ceiling, EPS panel, lighting system installation

Cleaning workshop floor before painting Epoxy

Outside the factory

Finished transformer station

Pre-casted concrete fences

Overview picture of NPI Vietnam factory

- Duy Hoang -

Contact Us

A: Room 605, Toyota My Dinh Building, No. 15 Pham Hung Street, Cau Giay Ward, Hanoi.

T: (+84) 243.7957.717

F: (+84-4).3795.7716

The South branch:No. 55, S Street, Lakeview City Urban Area, Binh Trung Ward, Ho Chi Minh City.

Tel: (+84-28) 35 35 1497

E: cjsc@cjsc.vn

Hotline: (+84) 983.384.888

© CJSC. All rights reserved | Design by Vtechcom

Lên đầu trang