CJSC

Investor's Confidence

Construction progress of SMC Tan Tao steel factory (13/07/2013)

06/11/2014

13/07/2013 The project SMC Tan Tao Steel factory is invested by SMC Tan Tao Sole member Co., Ltd and conducted in Tan Tao I.Z – Binh Tan district – Ho Chi Minh city. Perspective of SMC Tan Tao Steel factory - Ho Chi Minh city Photos of


13/07/2013 

The project SMC Tan Tao Steel factory is invested by SMC Tan Tao Sole member Co., Ltd and conducted in Tan Tao I.Z – Binh Tan district – Ho Chi Minh city.

Perspective of SMC Tan Tao Steel factory - Ho Chi Minh city

Photos of SMC construction site after 1 month of construction:


Building retaining wall for concreting location of beams, foundation and concrete floor monolithic


Concreting axial foundations


Concrete pumping the axial foundations and the roof slab


Checking and acceptance of reinforcement and formwork roof slab of security house before concreting


Concreting roof slab of guard house and marginal foundation grids

- Duy Hoang -

Liên hệ

Trụ sở chính:

Phòng 605, Toà nhà Toyota Mỹ Đình, Số 15 Phạm Hùng, Phường Cầu Giấy, Hà Nội

Tel: (+84) 243.7957.717

Fax: (+84-4).3795.7716

Chi nhánh phía Nam:

Số nhà 55, đường S, khu đô thị Lakeview City, phường Bình Trưng, TP. HCM

Tel: (+84-28).3535.1497

Email: cjsc@cjsc.vn
Hotline: (+84) 983.384.888

© CJSC. All rights reserved | Design by Vtechcom

Lên đầu trang