Construction progress in Hope Zone work site - Nghe An

Construction progress in Hope Zone work site - Nghe An

(12/07/2013) Hope Special Zone factory is the second project manufacturing livestock feed which CJSC signed and started conducting in the second quarter of 2013. Following the initial success of the project New Hope in Bac Giang province,

See more
Construction progress of SMC Tan Tao steel factory (13/07/2013)

Construction progress of SMC Tan Tao steel factory (13/07/2013)

13/07/2013 The project SMC Tan Tao Steel factory is invested by SMC Tan Tao Sole member Co., Ltd and conducted in Tan Tao I.Z – Binh Tan district – Ho Chi Minh city. Perspective of SMC Tan Tao Steel factory - Ho Chi Minh city Photos of

See more
Steel Structure erection at Ohashi work site

Steel Structure erection at Ohashi work site

(15/07/2013) Photos of Ohashi construction site – Vinh phuc at the end of week 15 (from 08/07 to 14/07) Steel structures are gathered in the construction site Erecting pillars for the workshop Building walls of the office’s second floor -

See more
Investor inspects the factory before finishing work

Investor inspects the factory before finishing work

(2507/2013) On 23.07.2013, the investor Ohashi Vietnam conducted acceptance the rough construction items of the office and a number of other auxiliary items. Besides, the erection of steel structures is also being conducted expeditiously.

See more
Updating photos of SMC Tan Tao construction work

Updating photos of SMC Tan Tao construction work

(08/08/2013) Photos in site: Installation reinforcement for the factory’s floor Installation reinforcement for the factory’s floor and machine foundation areas Concreting machine foundation The overview of SMC Tan Tao construction site -

See more
Update construction progress of Ohashi factory (31/07/2013)

Update construction progress of Ohashi factory (31/07/2013)

(09/08/2013) Photos of conducted items at Ohashi Vietnam factory by the end of 7/2013 Steel structure was erected Internal roads Finishing plastering external office walls The investor is checking and taking over the rough construction The

See more
Photos of installing metal roofing at Ohashi Vietnam factory

Photos of installing metal roofing at Ohashi Vietnam factory

(10/08/2013) Photos at the construction site Photos of installing metal roofing External walls of the office were finished plastering The investor is checking the work of metal roofing installation - Duy Hoang -

See more
Updating construction progress of New Hope factory (08/2013)

Updating construction progress of New Hope factory (08/2013)

(13/08/2013) Photos at the construction site: Finished product warehouse is going to be completed Steel structure erection Manufacturing tower is going to be finished erecting steel structure Break bulk warehouse is finished formwork

See more
Finish metal roofing installation at Ohashi factory construction site

Finish metal roofing installation at Ohashi factory construction site

Photos at Ohashi construction site by 11/08/2013 Workers are installing metal roofing The roofs of Workshop and the Offfice after completing metal roofing installation The office is connected to the workshop Other items Installing

See more
Photos of finising works in Ohashi construction site

Photos of finising works in Ohashi construction site

(26/08/2013) Typical photos: The work of cleaning and finishing tiling second floor Pass power cords into tubes in the office Installing water supply and drainage system Image of factory metal roof installation - Duy Hoang -

See more
Update construction schedule of SMC Tan Tao project

Update construction schedule of SMC Tan Tao project

(27/08/2013) Photos at the construction site: Disassembly Larsen bracing system-3m, hole depth is -6m Check formwork, reinforce of tank wall at second stage, hole depth is -6m Cast concrete for tank wall at the second stage, hole depth is

See more
Photos of Steel structures erection at New Hope construction site

Photos of Steel structures erection at New Hope construction site

(09/09/2013) Some photos of construction Raw material store is finished steel structure erection, prepared for metal roofing. Workers are fully equipped with protection equipment, safety nets and environmental sanitation. Break bulk

See more

Contact Us

A: Room 605, Toyota My Dinh Building, No. 15 Pham Hung Street, Cau Giay Ward, Hanoi.

T: (+84) 243.7957.717

F: (+84-4).3795.7716

The South branch:No. 55, S Street, Lakeview City Urban Area, Binh Trung Ward, Ho Chi Minh City.

Tel: (+84-28) 35 35 1497

E: cjsc@cjsc.vn

Hotline: (+84) 983.384.888

© CJSC. All rights reserved | Design by Vtechcom

Lên đầu trang